Case Studies

Discover how PROVITAB 3™ delivers tangible results and addresses unique water treatment challenges across a variety of applications.

Explore the Impact We’ve Made

Slaughterhouse Wastewater Treatment Plant

Slaughterhouse residual water treatment plant with content of BOD. Unreliable control of chlorine total and residual due to the use of bleach for treatment. Not meeting the operational permit limits of residual chlorine, pH and contaminants.

+80%

Reduction in chemical usage

23%

Cost reduction

1 to 2.5 ppm

Residual chlorine always within the required range

+80%

Reduction in chemical usage

23%

Cost reduction

1 to 2.5 ppm

Residual chlorine always within the required range

30.57%

Reduction in
product usage

25.76%

Annual cost
savings

25.52 lbs

Less product
used daily

Toluca Beverage Plant

A major beverage production facility in Toluca implemented the PROVITAB 3™ chlorination system as an alternative to calcium hypochlorite (H10). The plant achieved significant improvements in both chemical efficiency and cost.

30.57%

Reduction in
product usage

25.76%

Annual cost
savings

25.52 lbs

Less product
used daily

Pulp & Paper Mill Wastewater Plant

A pulp and paper mill wastewater facility upgraded its chlorination process to PROVITAB 3™ in order to meet discharge water standards of 0.5 ppm free chlorine and <10,000 MPN/100 ml total coliform count. With a daily flow of 0.635 MGD, the results were clear.

 

44.44%

Reduction in chemical usage

20.6%

Annual cost
savings

$56k

Annual operational savings

44.44%

Reduction in chemical usage

20.6%

Annual cost
savings

$56k

Annual operational savings

62.85%

Cost reduction
over 6 days

84%

Reduction in
product usage

3x

Longer refill
intervals

Drinking Water Facility

A drinking water facility switched from calcium hypochlorite to the PROVITAB 3™ system, leading to dramatic improvements in efficiency. This shift reduced chemical and labor costs and contributed to a faster break-even point and more streamlined operations.

62.85%

Cost reduction
over 6 days

84%

Reduction in
product usage

3x

Longer refill
intervals