Case Studies

Discover how PROVITAB 3™ delivers tangible results and addresses unique water treatment challenges across a variety of applications.

Explore the Impact We’ve Made

Toluca Beverage Plant

A major beverage production facility in Toluca implemented the PROVITAB 3™ chlorination system as an alternative to calcium hypochlorite (H10). The plant achieved significant improvements in both chemical efficiency and cost.

30.57%

Reduction in
product usage

25.76%

Annual cost
savings

25.52 lbs

Less product
used daily

30.57%

Reduction in
product usage

25.76%

Annual cost
savings

25.52 lbs

Less product
used daily

44.44%

Reduction in chemical usage

20.6%

Annual cost
savings

$56k

Annual operational savings

Pulp & Paper Mill Wastewater Plant

A pulp and paper mill wastewater facility upgraded its chlorination process to PROVITAB 3™ in order to meet discharge water standards of 0.5 ppm free chlorine and <10,000 MPN/100 ml total coliform count. With a daily flow of 0.635 MGD, the results were clear.

 

44.44%

Reduction in chemical usage

20.6%

Annual cost
savings

$56k

Annual operational savings

Drinking Water Facility

A drinking water facility switched from calcium hypochlorite to the PROVITAB 3™ system, leading to dramatic improvements in efficiency. This shift reduced chemical and labor costs and contributed to a faster break-even point and more streamlined operations.

62.85%

Cost reduction
over 6 days

84%

Reduction in
product usage

3x

Longer refill
intervals

62.85%

Cost reduction
over 6 days

84%

Reduction in
product usage

3x

Longer refill
intervals